What Should You Consider Before Renovating Your Home?

Sep 20
6 min read

Improving the comfort, functionality and design of a property can be done with the help of home renovation. However, just choosing colours and furniture does not mean that the renovation will be successful. As a result of poor renovation planning, a lot of money could be wasted, layouts may look impractical, and the construction process will take much longer than expected.


Before starting the renovation process, it is important for homeowners to check their budget, needs, current structure and future plans. Time spent making decisions at the beginning can prevent costly mistakes later on.


1. Set a Reasonable Budget


The budget impacts the cost, materials and quality of the home renovation process. Rather than selecting a rough figure, it is much better to make a thorough list of all the work to be done in every room.


A renovation budget may include:


  • Design and consultation fees

  • Civil work and labour

  • Flooring and wall finishes

  • Electrical and plumbing work

  • Kitchen and bathroom fixtures

  • Furniture and storage

  • Lighting and appliances

  • Waste removal and cleaning

  • Permissions, where applicable


The renovation cost can change once work begins, especially if the property has hidden plumbing leaks, dampness, damaged wiring or structural problems. It is sensible to keep approximately 10 to 15 per cent of the total budget as a contingency fund.


Ask for an itemised quotation that explains what is included and excluded. This makes the process of comparing proposals and assessing any unforeseen expenses much more uniform.


2. Determine Your Family’s Needs


Before thinking about how the renovation will take place, it is important to analyse how the renovated home will function. Every family has its own habits and needs.


Think about how many people live in the house, how old they are and what purpose each room serves. In the case of families with kids, the input might focus on storage and strong materials, while older family members need bathrooms that are easy to use and surface level that avoids stairs.


Create two lists – one list for the essential renovations as opposed to the second list, which includes those renovations that might be good to have but not among the priority renovations.

Thus, there are more chances to protect the essential renovations in case of limited budget implementation.


3. Analyze the Existing Property


Before the design is sanctioned, it is imperative to conduct a professional site analysis. This will reveal hidden defects, such as:


  • Moisture and leaks

  • Crevices on the walls or ceilings

  • Ancient wiring

  • Damaged pipes

  • Unflat floors

  • Poor air circulation

  • Problems with drainage


Using the visible walls and buildings without repairing the underlying problems may reinforce the need for constant repairs. For instance, treating a damp wall with fresh paint will not eliminate the moisture problem, meaning that the treated wall will require repainting in the future.


The analysis will also assist in making decisions about the materials that can be salvaged. For example, in many cases, using whatever flooring, doors, or furniture are available may decrease the renovation fees and expenses.


4. Design the Space for Daily Use


Effective space planning is about much more than just making rooms bigger. Space planning increases movement, storage, comfort and usage.


Review the current layout first and decide which parts of it feel cramped, dark or neglected. Look at furniture sizes, door sizes, space to walk, places for electricity and natural lighting before going ahead with a new plan.


It is important to include options for storage. Built-in closets, cabinets with lots of shelf space, cupboards under the stairs and multi-use furniture items will keep the space tidy without using extra square footage.


During renovation work, homeowners tend to think that having an open-plan layout is the best solution. But opening rooms is not always the best strategy. You need to think about privacy, cooking smells, noise and heating and cooling.


Functional layout will promote daily activity instead of following design trends.


5. Finalise the Design Before Work Begins


Frequent design changes during execution can increase costs and delay completion. Major decisions should therefore be finalised before workers begin dismantling the existing space.


The design stage should cover:

  • Room layouts

  • Furniture placement

  • Colour combinations

  • Flooring and wall finishes

  • Lighting

  • Electrical switches and sockets

  • Plumbing points

  • Kitchen and wardrobe designs

  • Doors, windows and hardware


Interior renovation requires coordination between visual design and technical planning. A beautiful drawing will not be enough if electrical points, plumbing lines and furniture dimensions are not properly considered.


Three-dimensional designs can help you understand the proposed appearance, while technical drawings guide the workers during execution. Both should be checked carefully before approval.



6. Pay Attention to Structural Changes


Making structural changes such as removing a wall, replacing a staircase, adding a new opening, or an extra storey will impact the safety of the building. Structural changes must be made according to verified data rather than relying on mere conjecture or opinions of someone who has no appropriate qualifications.


Before carrying out any structural change, ask for inspection by the building authorities, appraisers, an architect or a civil engineer. Some structural changes may require additional support including the introduction of beams and columns. Other structural changes may need permit approval from the proper authorities or the residents' association.


Consider the structural aspects of the modifications beforehand to be able to plan the design and budget for the renovations.


7. Select Materials for Long-Term Value


Even though the price of materials is important, it should not be the only criterion for selecting materials. Some cheap flooring, plumbing, hardware, and waterproofing products will require frequent repairs.


The following parameters should be considered when choosing materials:


  • Durability

  • Maintenance

  • Water and heat resistance

  • Warranties of use

  • Safety

  • Specifications

  • Satisfaction of requirements


The chosen materials should meet the demands of the place where they will be used. Kitchen counters, bathroom flooring and wardrobe hardware generally experience more wear than decorative surfaces.


Create a written material schedule containing the approved brand, model, colour, size and finish. This reduces the confusion and prevents unauthorised substitutions during the home renovation.


8. Select an Appropriate Renovation Group


Complete home renovation may require focused attention from architects and interior designers, civil engineers, electricians, plumbers, carpenters and painters. Poor management of these professionals may lead to loss of communication which may hinder good quality and progresss of the renovation process.


Before hiring a renovation company the following aspects should be examined:


  • Who will supervise the site?

  • Who will be responsible for delivery of information?

  • What will be included in the coordination of design?

  • Who will be responsible for material deliveries?

  • What is the process of approval of extra work?

  • What methods of quality checks will the company apply?

  • Is there a schedule of the project approved by the company?


The lowest bid is not always the best. Compare the skills and experience as well as the ability to solve various logistical problems which might occur in order to avoid misunderstandings in the process of renovation.


9. Establish a Clear Timeline


A realistic schedule should cover design approvals, dismantling, civil work, plumbing, electrical work, flooring, carpentry, painting and final installation.


Some activities depend on the completion of earlier work. For example, painting cannot be finished before concealed electrical and plumbing work has been tested. Similarly, custom furniture production may require final site measurements.


Homeowners should also prepare for dust, noise and temporary disruption. Decide whether the family can remain in the property or whether temporary accommodation will be required. Discuss working hours, site access, material storage and waste removal before execution begins.


Conclusion


Home renovation is successful only if it begins with precise specifications at the outset, realistic budgets and thorough planning. Evaluate the existing real estate, set the priorities for functionality, work out the fine engineering specifications, and select materials with account of their expected durability.


But the key is to collaborate with a team that executes design, construction, procurement of materials and works. REHOC offers full home renovation and construction services in Dehradun and Mohali.



Frequently Asked Questions


1. How much contingency should I keep for a home renovation?

In general, it is reasonable to keep around 10 to 15% of the budget as contingency funds. Yet, the actual amount depends on the condition and age of the property.

The timeline varies depending on both the size and scope of work. Interiors can be remodeled in a few weeks while a full-scale renovation involving civil construction may take several months.

Staying in the house is an option for a small renovation. But for bigger renovations like kitchen work, bathrooms or electrical and plumbing repairs, it is best to find temporary accommodation for own comfort.

Yes. The process of removing walls and changing staircases and structural components should be monitored by a certified architect or structural engineer. Approval may also be required in some cases.

Finalizing the design avoids any last-minute changes and delays and additional costs, allowing architects, workers, and contractors to adhere to the same specification.


 
 
 